Joint MinSouth and BTS meeting
Hyuk-II Jung is speaking from Arup Description of the talk: A twin bored, segmentally lined tunnel being constructed in soft marine deposit ground completely collapsed in March 2020 during cross-passage construction. Due to the soft ground conditions, the area at the cross-passage location was pre-treated with grout prior to tunnel boring machine (TBM) […]
